Construction Activities

STATUS OF INFRASTRUCTURE IN JNV’S

 

I

Area of land  allotted (in acres)

Whether land transferred in the Name of Samiti

Vidyalaya shifted to permanent buildings on

 

:4.08 Hact. Are

:Yes

 

: 31.08.2011

 

ii

Status of Boundary Wall

a.  Brick Wall
b.  Barbed wire fencing

 

:

 (30% Incomplete)

 

iii

Permanent buildings constructed

 

: (CPWD Pattern)

 

iv

School building

 

: Complete

 

v

Dormitories

:  Boys 01.75Nos. (168 Bed )
   with Warden Residence--03 Nos.

 

 

 

:  Girls 02Nos.192 Bed
   with Warden Residence--04 Nos.

 

vi

Kitchen/dining Hall

No. of shifts required for all students  to take food

 

:  Complete  Area 3600 Sq. Fit
Single Shift

 

vii

Principal Residence

 

:  01 No.

 

viii

Staff Quarters

 

 

: Type III = 16 Nos.
  Type II = 04 Nos.
  Type  I  = 04 Nos.
  SP Sheds converted into Staff Qrs.:Nil Nos.

 

ix

M.P. Hall

: not available

x

Workshop

: not available

xi

Type of O.H. Tank

Its capacity

Present Status

: Shaft type

Not Applicable

xii

U.G. tank

Its capacity

Present Status

 

:  200 K. litres

: Working satisfactory

xiii

D.G. Set

 

 

:  Available
: 5 KVA
: Working
: 2006 Donated by Parent’s

xiv

Sewage Pump

: Nil H.P.

xv

Water Pump

 

: Nil capacity

xvi

Electrification

Electric connection
Sub Station building
Street lighting

Numbers of hrs. during day when power supply is available on an average.

 

 :  Rural Feeder
:  Incomplete
: 38 Nos. of Poles

:23 hrs.
  

xvii

Playfields

400 metre track
40 x 30 metre basket ball court
40 x 30 metre volley ball court
 

 

: Available
:  Not available
:  01Nos.   – Available

xviii

Water supply
Connection from PHED

 

 

:  24 hours supply

xix

Rajiv Gandhi Smriti Van

:  Available

xx

Fire fighting arrangement

:  Working

xxi

Last date of cleaning of

  1. Septic tank
  2. Water tanks

 

:25.06.2013
:27.06.2013

xxii

Whether area around transformer is fenced

:  Yes 

xxiii

Whether open wells, if any, are covered from top

:   N .A.

xxiv

Works taken up under M&R fund during current year and last year:-

:50 Thousend in 2012-13
:2.00 Lakhs  in 2013-14

Year

Name of work  (M&R)

Expenditure
(Rs. In lacs)

Cumulative expenditure during the year

2012-13

Day to day Maintence

47.00 Thousand

2.00 Lakhs  in 2013-14

           
 

 

 

Details of vehicle provided to the Vidyalaya

(i)

Whether vehicle is provided or not

(Yes)

(ii)

Description to vehicle.

TATA Gold  (09 Sheater)

(iii)

Model no and date of purchase.

TATA Gold   July,2012

(iv)

Present condition of the Vehicle.

Good